Roll call: who's there and emergencies

present: hiro, gaba, anarcat

GitLab backups are broken: it might need more disk space than we need. just bump disk space in the short term, consider changing the backups system, in the long term.

Dashboard review

We reviewed the dashboard, too much stuff in January, but we'll review in February.

Roadmap 2021 proposal

We discussed the roadmap project anarcat worked on. We reviewed the 2020 retrospective, talked about the services survey, and discussed goals for 2021.

2020 retrospective

We reviewed and discussed the 2020 roadmap evaluation that anarcat prepared:

  • what worked? we did the "need to have" even through the apocalypse, staff reduction and all the craziness of 2020! success!
  • what was a challenge?
    • monthly tracking was not practical, and hard to do in Trac. things are a lot easier with GitLab's dashboard.
    • it was hard to work through the pandemic.
  • what can we change?
    • do quarterly-based planning
    • estimates were off because so many things happened that we did not expect. reserve time for the unexpected, reduce expectations.
    • ticket triage is rotated now.

Services survey

We discussed the survey results analysis briefly, and how it is used as a basis for the roadmap brainstorm. The two major services people use are GitLab and email, and those will be the focus of the roadmap for the coming year.

Goals for 2021

  • email services stabilisation ("submission server", "my email end up in spam", CiviCRM bounce handling, etc) - consider outsourcing email services
  • gitlab migration continues (Jenkins, gitolite)
  • simplify / improve puppet code base
  • stabilise services (e.g. gitlab, schleuder)

Next steps for the roadmap:

  • try to make estimates
  • add need to have, nice to have
  • anarcat will work on a draft based on the brainstorm
  • we meet again in one week to discuss it

Other discussions

Postponed: metrics services to maintain until we hire new person

Next meeting

Same time, next week.

Metrics of the month

Fun fact: we crossed the 2TiB total available memory back in November 2020, almost double from the previous report (in July), even with the number of hosts in Puppet remained mostly constant (78 vs 72). This is due (among other things) to the new Cymru Ganeti cluster that added a whopping 1.2TiB of memory to our infrastructure!

  • hosts in Puppet: 82, LDAP: 85, Prometheus exporters: 134
  • number of Apache servers monitored: 27, hits per second: 198
  • number of Nginx servers: 2, hits per second: 3, hit ratio: 0.86
  • number of self-hosted nameservers: 6, mail servers: 12
  • pending upgrades: 3, reboots: 0
  • average load: 0.29, memory available: 2.00 TiB/2.61 TiB, running processes: 512
  • bytes sent: 265.07 MB/s, received: 155.20 MB/s
  • GitLab tickets: 113 tickets including...
    • open: 0
    • icebox: 91
    • backlog: 20
    • next: 12
    • doing: 10
    • (closed: 2165)

Now also available as the main Grafana dashboard. Head to https://grafana.torproject.org/, change the time period to 30 days, and wait a while for results to render.